Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

September 15, 2023

October 6, 2023

ME-218

Site Work

No Information to Display

$148,793.00

Public - State/Provincial

img_map_placeholder

ME-218, Alna, ME

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

This Work shall consist of installing a culvert pipe in reasonably close conformity with the lines and grades shown on the plans and notes, or established by the Resident; traffic control; saw cutting and removing the old roadway and disposing of the material; installing cofferdams; removing and disposing of the existing culvert pipes; providing temporary erosion and water pollution control; placing hot mix asphalt in all trenches; placing rip rap, mulch, seed, erosion control bark mulch, special backfill; and locating and coordinating with all utilities. Description: 029085.00 Location: Lincoln County in the town of Alna on Route 218. Outline of Work: Wetland culvert replacement and other incidental work. For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information fax all questions to Gail Iler at (207) 624-3431, use electronic RFI form or email questions to RFIContracts.MDOT@maine.gov, project name and identification number should be in the subject line. Questions received after 12:00 noon of Monday prior to bid date will not be answered. Each Bi d must be made upon blank forms provided by the Department and must be accompanied by a bid bond at 5 % o f the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States postal money order in the amount o f 5% of the bid amount, payable to Treasurer, State of Maine as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount o f 100 percent of the Contract price, will be required o f the successful Bidder. This Contract is subject to all applicable Federal Laws. This contract is subject to compliance with the Disadvantaged Business Enterprise program requirements as set forth by the Maine Department of Transportation. The right is hereby reserved to the MaineDO T to reject any or all bids. MEDOT - Wetland Culvert Replacement - Alna - Region 2

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.