Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 18, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, South Padre Island, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Questions and inquiries about this Solicitation shall be submitted in writing to the following individual: Kristina Boburka Shoreline Director kboburka@myspi.org The deadline for written questions is August 7th, 2023 at @ 2:00 p.m. central time. The City is seeking a qualified firm for all associated tasks in regard to dune restoration along the City of South Padre Island's shoreline. This includes, but is not limited to, permitting, surveying, design, installation, and maintenance of the restoration areas. Permitting includes coordination between the City and Texas General Land Office. The selected firm will be expected to prepare a multi-year phased approach for the project. All vegetation for this project must be fully sourced from South Padre Island. B. The City is also interested in monitoring the project to quantitate he amount of sediment that is accumulated from the project's placement of sand fencing and dune vegetation. The selected firm will need to provide tracking metrics and methodology within their proposal. Multiple methods can be utilized for volume accumulation such as deposit gauges, plant growth/health, weather patterns, dune height/width, etc. C. Proposed costs shall be estimated for all materials and labor needed to establish a 10-foot linear beachfront area, within a restoration reach of one mile. Restoration will focus on the northern two miles of the City'sshoreline, but may encompass other areas within the City limits as well as mitigation needs throughout the City's dune system. D. To best achieve consistency for the importance of coastal preservation, protection, and preventative action, the City is seeking to award a contract/agreement with an initial term of two (2) years that will become effective from the date of acceptance and approval by the City of South Padre Island. It shall remain in full force and effect with the firm's fixed contractual pricing for twelve (24) months. Upon completion of the term of the original agreement and upon mutual agreement of both parties, the original agreement may be renewed for up to three (3) additional one (1) years [five (5) yearsin total]. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.