Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

September 19, 2024

2601 Vista Pkwy

Renovation

No Information to Display

$300,000.00

Public - County

img_map_placeholder

2601 Vista Pkwy, West Palm Beach, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

a. The work covered by this Request for Quote consists of the furnishing of all labor, equipment, devices, tools, materials, transportation, professional services, supervision, drawings, permitting, and all miscellaneous requirements to perform all operations necessary to accomplish the work set forth below and shall be considered part of the Scope of Work. b. Please reference the Annual Contract - Minor Construction for additional requirements. c. Work to be completed during the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday. d. Contractor shall contact the Project Manager within seventy-two (72) hours of notice to proceed to establish scheduling, etc. required for project implementation. e. Work to be completed within three hundred sixty (360) calendar days from Notice to Proceed. Permit application, if required, is to be submitted by Contractor within five (5) days of Notice to Proceed and due diligence exercised to address all Building Department comments. f. Liquidated damages will accrue in the amount of $120 per day. g. The Contractor will provide a Certificate of Occupancy or Certificate of Completion, as appropriate, obtained from the proper Building official, prior to processing of final payment. h. Contractor is responsible for obtaining all measurements during the site inspection Vista OSC, Fleet - Creation of Office Space The purpose of this pre-bid meeting will be to review the requirements for the project. You must attend this meeting if you intend to bid this work A contractor may obtain a Qualification Application for this Annual Contract by sending an email with the Project Prequalification: Annual Contract Minor Construction in the subject line to FDO-CID-Bids@pbcgov.org or call (561) 233-0261. Palm Beach County reserves the right to waive any bid irregularities, informalities, or technical deficiencies and to reject any and all quotes/bids.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.