Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 2, 2023

December 31, 2028

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Stanwood, WA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Twin City Mile revitalization project reimagines how the City`s main downtown commercial corridor, 271st and 270th Streets, could look and function by connecting City Hall Park to the Train Station. Project elements include constructing gateways, reconfiguring travel lanes and parking, building wider sidewalks and plaza areas, constructing park areas, and installing street trees, art, and other curb appeal amenities. Using policy guidance from the City Beautification Plan, the City initiated the Downtown Revitalization Project that invests in the downtown business district infrastructure by: Creating Pedestrian-Friendly Streets; Actively Engage Storefronts with Walkable Sidewalks; Encourage Use of Streets for Community Festivals; Create Usable Urban Park Spaces; and Promote the Concept of Buying Local. Over the next six years, the project will be broken into multiple phases as follows: 2023: West End Brick Road 10% Design, 92nd Avenue Design and Construction, 92nd Avenue Lighting, 88th Avenue Lighting Design, East End Concept Designs and Traffic Calming, 88th Avenue Arch, West End Gateway 2024: Camano Street Design, 88th Avenue Power & Lighting Construction, East End Traffic Calming Improvements 2025: Camano Street Construction 2026/2027: West End Brick Road 100% Design and Permitting 2028: West End Brick Road Construction This project is included in the City of Stanwood's FY 2023-2024 Capital Improvement Program (CIP) As of August 4, 2023, information regarding a design team or a general contractor is not available. Construction is anticipated from 2023 to 2028.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.