Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 22, 2024

No Information to Display

2300 E Gibson Rd

Site Work

No Information to Display

$25,000,000.00

Public - County

img_map_placeholder

2300 E Gibson Rd, Woodland, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The "Soccer Fields" project is the first phase of a number of phases that will likely be needed to complete the WCC Sports complex. It is the intention of the College to have a fully functional "game field" and "practice field" no later than the Fall of 2024. There are also a number of additive alternates listed that will need to be designed and a cost estimate made to support a College/District Capital fund raising Campaign through the District Foundation. Future Sports Complex phases are not included in the design work of this project and will be contingent on a number of factors including whether a future Obligation Bond Measure is presented and approved by the voters of the College/District, and the success of the First Phase Soccer Fields project in successfully meeting it's project objectives. The scope of the "Soccer Fields (2) Project" will likely include the following: o Campus Site Research and Investigation of Existing Utilities and Site Conditions o Game Soccer Field o Practice Soccer Field o Pest control underground control fence barriers around the fields to 18" depth. o Irrigation Systems o Gravel Parking Areas o Minimal Landscaping with addition of drought tolerant non-allergenic low maintenance shade trees around the practice field, and the game field. Include deep watering tree root irrigation system. o Accessibility access path to both paved parking stalls, and existing restrooms in building 800. o Fencing along the roadways or as needed to protect the fields. o Topographical Survey in Project Area. o Repurposing/repairs of an existing double modular building to be used as a temporary training/locker room for the soccer program. Paint exterior and interior. Design new wayfinding sign for this building. o Wayfinding signs from the large north parking lot to the soccer fields to make it easy to find the soccer fields. o Update the campus main wayfinding "kiosk" signs to include the new Performing Arts and Culinary Services building and the new soccer fields. o Project Schedule o Schematic Design o Construction Documents (drawings and specifications) o Division of the State Architect (DSA) submission. o Digital Electronic Colored rendering of the phase I soccer fields project scope o Digital Electronic Colored rendering of the entire sports complex. o Rough Cost Estimate the rest of the future sports complex. o DSA Submission and process support through DSA approval. o Contract Administration through construction completion o Phase I Soccer Fields Project cost estimate, generated by a qualified cost estimating firm in the local area that uses actual project costs of other projects to generate the cost estimate. If a Firm has the capability and expertise to provide an accurate estimate +/- 10 percent, using the actual local similar project costs, then this is also acceptable. o Note: The College/District would like natural grass fields over artificial turf fields. o Additive Alternates to be designed and a cost estimate generated as part of the scope of this RFP and bid by the contractor as additive alternates to the base bid items above: o Sports Fields Equipment and Supplies Storage/Maintenance Building o Items to be planned, and a budgetary cost estimate generated separately for each of the following items included as part of the scope of this RFP: o Lighting around the game field, walkways, parking lot. o PA announcement system BONDS: There are no bid bond, payment bond, or performance bond requirements on this Architectural Design Services August 1, 2022: 5:00 PM, All questions and requests for information must be submitted to David Willis at: dwillis@yccd.edu. Approximate Award Date: September 22, 2023 DSA review completed: March 1, 2024 Award Contractor: May 16, 2024 The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.