Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

September 14, 2023

November 13, 2023

Walnut St

Demolition, Site Work

No Information to Display

$111,980.00

Public - City

img_map_placeholder

Walnut St, Colwyn, PA

Subscribe to View Full Documents

Bidders are required to submit a surety in the form of a bond or equivalent meeting 10% of the overall bid price in compliance with the contract documents. Bid bonds will be returned to the non-awarded bidders upon the execution of the contract. The successful Bidder shall also be required to provide a Performance Bond in an amount of one hundred percent (100%) of the Contract amount within ten (10) calendar days of receipt of written notice of acceptance of the Bid A uniform fee of 0.333% (1/3 of 1 percent) of the bid amount (up to $5,000) is applied only to bidders who are awarded contracts. No fees apply to bidders who submit without being awarded the contract The Borough reserves the right to reject any or all bids or to accept any portion of any bid, and to award Contracts as is deemed best for the Borough Contractor shall provide all equipment, labor & materials required to clean and restore the work area to at least the existing condition. A. For restorations, all materials shall comply with the latest revision ofthe Commonwealth of Pennsylvania, Department ofTransportation Specifications and as approved by the Owner. C. At the completion ofwork, remove waste materials, rubbish, tools, equipment, machinery and surplus materials; clean all visually exposed surfaces; leave project clean and ready for occupancy. D. At the completion ofwork, restore or replace, where and as directed by the Owner, any public or private property disturbed or damaged by Contractor's work operations to a condition at least equal to that existing prior to beginning work, or as otherwise specified. Materials, equipment and methods shall be approved by the Owner. B. Maintain premises free from accumulations ofwaste, debris and rubbish caused by work operations. All interested parties must submit questions via the web based system, by the posted deadline for questions. Bidders are not permitted to contact the Borough Engineer or staff directly.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.