Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 11, 2023

September 11, 2023

January 9, 2024

3225 College Ave

Site Work

No Information to Display

$400,000.00

Public - Federal

img_map_placeholder

3225 College Ave, Davie, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Replace Sanitary Sewer Line Ft. Lauderdale, FL GENERAL SCOPE OF WORK: The contractor shall install approximately 300 feet of buried 6 inch polyvinyl chloride (PVC) pipe connecting building 3 to the Town of Davie sanitary riser at Invasive Plant Research Laboratory campus at 3225 College Avenue, Ft. Lauderdale, FL. Contractor will also inspect and unclog sanitary connections between buildings B001 and B003 and under B003 to assure proper functioning of this entire interconnected system. The contractor shall engage a locator service to locate underground utilities prior to excavating or trenching. The exact location of existing water and electrical lines running along the south side of B003 towards the Town of Davie sanitary sewer is unknown. The Contractor shall use due diligence to ensure the existing lines are not damaged. Hand digging may be warranted in some instances. Damage to utilities caused by the contractor shall be repaired at no additional expense to the Government. Grassed areas disturbed by the construction shall be sodded with Argentine Bahia. Roadway shall be patched with matching asphalt material. All work shall be accomplished in accordance with the general requirements above and materials and installation shall comply with the most recent ARS 242-01M manual. Question Deadline 07/28/2023 at 3:00 PM ET Answers to any questions received by that time will be posted as an amendment to this combined synopsis/solicitation.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.