Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

September 21, 2023

August 25, 2024

Multiple Locations

Addition, Demolition, Paving, Site Work

No Information to Display

$900,000.00

Public - City

img_map_placeholder

Multiple Locations, Marion, IL

Subscribe to View Full Documents

Project Description: The scope of the project includes the construction of three new additions; Addition 1: a new front entry vestibule; Addition 2: a new connecting link with two restrooms, lobby, storage, and a Caterer Kitchen; and Addition 3: a gymnasium. All three additions combined total approximately 5000 SQFT. Additions 1 & 2 are of metal stud construction with metal roof panels and an EIFS exterior finish. Addition 3 is a pre-manufactured, mono-slope, metal building for a half-size basketball court, with metal roof and wall panels. Civil work includes new sidewalks, parking pavement, parking spaces, and new water and gas lines. MEP scope of work includes the following. The existing air handling unit will be reused and moved to the roof of the new addition and re-ducted. Two new roof top units will provide HVAC to the lobby and gym area. A new 600A service will be brought in to the new addition and the existing 400A service will be refed from the new. The remainder of the new power will energize the lobby and gym. A new 1 water service and 4 sanitary with be run in the existing parking area out to the street. This will supply and drain two new bathrooms and a concessions area. Instantaneous water heating will be utilized.

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.