Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 8, 2023

November 7, 2023

October 6, 2024

3259 Catlin Ave

Renovation

No Information to Display

$5,000,000.00

Public - Federal

img_map_placeholder

3259 Catlin Ave, Quantico, VA

Subscribe to View Full Documents

$750M 8(A) MACC CONTRACT HOLDERS ONLY This project will renovate Building 3259, Naval Health Clinic Quantico Pharmary area. Work must meet all applicable UFC codes, provide functional layouts, and meet all requirements indicated in the Scope of Work (SOW). During renovation of the pharmacy area, a temporary trailer will be provided to serve as a temporary pharmacy for the clinic. NAVFAC Solicitation Number: N4008022D2222 X007 NAVFAC Project No.: 1700442 Title: BUILDING 3259 PHARMACY RENOVATIONS AND HEALTH CLINIC REPAIRS Location of the Work: Marine Corps Base Quantico, Virginia Description of the Work: This project will renovate Building 3259, Naval Health Clinic Quantico Pharmary area. Work must meet all applicable UFC codes, provide functional layouts, and meet all requirements indicated in the Scope of Work (SOW). Estimated Budget Amount or Price Range: In accordance with DFARS 236.204 (or FAR 36.204, depending on project size) Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $1,000,000 and $5,000,000. NAICS CODE: 236220 - Commercial and Institutional Building Construction Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government desires completion of construction within 334 calendar days after award (includes 15 calendar days for submission and approval of bonds and insurance). Wage Determination: Department of Labor (DoL) General Decision Number VA20230162 06/30/2023 applies to this work. See Attachment E. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated at the time of award. The wage determination version in effect at the time of award shall apply to the work performed under this contract. Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages - Construction, Liquidated Damages will be assessed in the amount of $1,027.60 for each calendar day of delay until the work is completed or accepted. Pre-Proposal Inquiry (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries must be made in writing and shall be submitted via email to Ms. Dotty M. Medel no later than 16 August 2023 by 2:00PM EST with inquiries attached as a Word document (no tables please) (ATTACHMENT F). Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contract Number: N4008020D0017

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.