Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 1, 2023

September 29, 2023

6215 NE Bothell Way

Demolition, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

6215 NE Bothell Way, Kenmore, WA

Subscribe to View Full Documents

Work includes the following elements : 1. Provide notification for asbestos removal to Puget Sound Clean Air Agency. Remove and legally dispose of all asbestos containing materials from the site in accordance with federal, state, local regulations, and Part 4 of these technical specifications and provide the required disposal documentation per Part 4 of these technical specifications. Asbestos containing materials are known to exist on site; see the asbestos reports in Appendix B for more information. 2. Complete the demolition work in accordance with these technical specifications and any site plans or exhibits included with these technical specifications or in the Contract Documents for the site. 3. Remove and legally dispose of all structures, trash, rubbish, walls, floors, foundations, porches, steps, equipment, materials, debris, and hazardous waste from within the limits of work, as shown in the site plans attached in Appendix A, in accordance with these specifications and all applicable federal, state, and local regulations. 4.Re-grade the site, in accordance with these specifications, to remove any hazards and maintain existing drainage patterns. 5. Disconnect and cap sewer connections from the site, in accordance with these specifications. Contractor shall obtain and pay for applicable sewer disconnect permits from Northshore Utility District. 6.Provide stabilization and seeding, in accordance with these specifications, for all exposed soils created during the project.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.