Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 1, 2023

February 26, 2027

Multiple Locations

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Woodbridge, NJ

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Replacement of Structure No. W112.72B, Milepost W112.0 to W112.7, involves the construction of a new Structure No. W112.72B Ramp SWT over Berry's Creek Canal and new ramp alignment to the east of the existing ramp including column supported embankment; 763 LF retaining wall; improvement to lengthening of the deceleration lane; replacement of two Overhead Sign Structures; and the structural rehabilitation of Culvert No. W112.26, roadway, bridge and navigational lighting, and other incidental work. The new Structure No. W112.72B will be 451 feet long by 58 feet wide consisting of a three-span continuous steel superstructure, substructure includes two reinforced concrete abutments supported on h-piles and two piers located in the water supported on drilled shaft foundations. The contract includes the demolition of the existing Structure No. W112.72B; concrete deck removal and reconstruction; removal and replacement of deck joints; replacement of fascia parapet and median barriers; wingwall modifications; roadway lighting and drainage improvements; structural steel repair; splash zone repainting of structural steel; substructure membrane waterproofing; paving; pavement striping; emergency and routine repairs under cost plus compensation; maintenance and protection of traffic measures; and other miscellaneous work necessary and incidental to the completion of the project, all as described in the standard specifications, supplemental specifications, and as shown on the plans. The work is primarily located on the Westerly Roadway from Milepost W112.0 to W112.7 in the Borough of East Rutherford in Bergen County, New Jersey. Replacement of Structure No. W112.72B, Milepost W112.0 to W112.7, will begin in December of 2023 and will take approximately forty-one (41) months, including project closeout to complete. Inquiries pertaining to this RFEOI are to be directed in writing to Enrico Paternostro, via e-mail at epaternostro@njta.com with a copy to gcoleman@njta.com. The subject line should read "OPS No. T3957, EOI Inquiry". The deadline for inquiries is July 28, 2023 Responses will be posted on the Authority's website under "Doing Business, Current Solicitations" on or before August 1, 2023. The estimated construction cost is $90-$110 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Recommendation to Award OPS October 24, 2023 Notice to Proceed November 2023 Completion of all Services February 2027 Administration Project Closeout May 2027 The method of Contractor Selection has not been Determined at this time

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects