Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 1, 2024

No Information to Display

Millbrae Ave

Paving, Site Work

No Information to Display

$320,000.00

Public - City

img_map_placeholder

Millbrae Ave, Millbrae, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The main objective was to provide a contiguous pathway for pedestrians and bicyclists along the Eastern end of El Camino Real from Old Bayshore to San Anselmo (San Bruno City Limits). Work scope includes Class IV bike path on E Millbrae Ave between Rollins and Old Bayshore as an alternative to Ped & Bike bridge over HWY101 Class III bike path along Aviador, Hemlock, and San Anselmo to bridge missing gaps from San Bruno City limits to the existing Class I Monterey Trail and the existing multimodal transit center Install safe route to school improvements green infrastructure at the intersection of Richmond Dr and Laurel Ave This project is included in the City of Millbrae's FY 2023-2028 Capital Improvement Program (CIP). As of August 16, 2023, information regarding a design team or a general contractor is not available. Construction is anticipated in 2023/2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.