Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

June 21, 2024

800 Scott St

Renovation

No Information to Display

$335,000.00

Public - City

img_map_placeholder

800 Scott St, Baltimore, MD

Subscribe to View Full Documents

A. Project Identification: Baltimore City Public Schools Restroom Renovation Project for George Washington Elementary #022. 1. Project Location: 800 Scott St., Baltimore, MD 21230. B. Owner: Baltimore City Public Schools, 200 East North Avenue, Baltimore, MD 21202 C. Architect/Engineer: GVA Architecture and Interior Design, 5501 Twin Knolls Road, Suite 108, Columbia, MD 21045, 410-997-1000 Min Engineering, Inc., 10 Sudbrook Lane, Pikesville, MD 21208, 410-486-4692. Freeman Architecture, 4609 Harford Rd., Baltimore, MD 21214 D. The Work consists of a one for one toilet fixture replacement in all toilet rooms. In some toilet rooms two toilet stalls will be combined into one stall to come as close to ADA compliance as possible given physical constraints of space in toilet rooms. All ceilings, lighting and finishes will be new as well. E. Project will be constructed under a single prime contract. PSC NUMBER : 30.177.21 ESSER Restroom Upgrades at George Washington Elementary School #022 Question Deadline: 08/08/2023 at 4:00 PM ET Bid check in amount equal to 2% of the total lump sum bid price Payment and Performance Bonds in the total amount of award stated in the letter (Payment & Performance Bonds shall be provided as Contractor's overhead expenses without any additional cost to Baltimore City Public Schools). MBE Participation (%) 27.00 African American MBE Participation (%) 8.0 Women-Owned MBE Participation (%) 11.0 All Contractors bidding on this solicitation must first be prequalified by the Baltimore City Department of Public Works City Schools reserves the right to accept or reject any or all responses received as a result of this request, or to cancel this solicitation in part or in its entirety

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.