Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 6, 2023

October 10, 2023

May 31, 2025

Northwest Angle 33 First Nation

Renovation, Site Work

No Information to Display

$10,960,081.00

Public - County

img_map_placeholder

Northwest Angle 33 First Nation, Kenora, ON

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Northwest Angle 33 First Nation is proceeding with upgrades to the existing treatment plant in the community of Dog Paw. The community is located 55 km southeast of Kenora, Ontario, on the southern shore of Dog Paw. The reserve lands are accessible year-round via Highway 71. The general scope of work consists of the following: - Expansion of an existing water treatment plant and underground concrete reservoir. The building expansion will be a pre-engineered steel building with a building footprint of 14.7 m x 11.7 m over a 228 cubic metre concrete reservoir. - Renovate the existing 160 square water treatment plant building. - Installation of a pre-selected hollow fibre nano filtration membrane treatment system with a capacity of 269 cubic metres per day. - Supply and installation of new raw water pumping systems with new raw water intake piping, distribution pumping systems, chemical feed systems, process piping and UV disinfection system - Supply and installation of new lighting, heating and ventilation systems - Installation of a pre-purchased genset and MCC. - Careful staging of upgrades is required to allow the existing water treatment plant to operate without interruption. The General Contractor will be required to retain a certified water treatment plant operator to operate the new water treatment plant during portions of construction. - Construction of a settling tank system for process waste water, and the relocation of an existing residential septic field. - The water treatment system has been pre-arranged with Delco Water. General Contractor to sign a Novation Agreement and co-ordinate installation works with Delco Water. - The MCC and Genset equipment pre-purchase is currently out for tender. General Contractor to sign a Novation Agreement and co-ordinate installation works with the successful supplier. Additional information will be provided with the General Contractor Tender. Interested General Contractors who have expertise in wastewater or water treatment plant construction are invited to submit Pre-Qualification Documents. Official bid documents must be obtained from www.merx.com

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.