Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 12, 2025

October 16, 2023

April 16, 2025

FM 544

Paving, Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

FM 544, Wylie, TX

Subscribe to View Full Documents

Vendor will furnish all labor, material and equipment, and perform all work required for construction of road improvements including a round-about and traffic signal Approximately 14,000 CY of excavation; 15,000 CY of embankment; 6,000 SY of temporary pavement; 46,000 SY of 8 concrete pavement; 51,000 SY of lime subgrade treatment; 8,000 SY of sidewalk or trail; 21,000 LF of pavement markings; 6,700 LF of 18 to 36 RCP and 3x2 to 7x3 RCB; 45 storm drainage inlets; 9 storm drainage manholes; 800 LF of 12 water; 7,000 LF of 6 wastewater force main; 6,700 LF of 2 PVC and ground boxes for illumination; 1 traffic signal, and miscellaneous landscaping. 5% Bid Bond Engineer s estimated construction time: 548 days to substantial completion Question Deadline: 8/10/2023 12:00 PM (CT)

62 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.