Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

July 8, 2024

February 3, 2025

SR 519

Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

SR 519, Seattle, WA

Subscribe to View Full Documents

Removal of the existing vehicle transfer span, associated cable lifting frame and support piling, installation of new hydraulic transfer span and apron, drilled shaft foundations and replacing the end batter pile located on the left wingwall and modification to the bridge seat and other work. Involves 39 items and 150 working days. Work class 6 or 43. County King County Estimated value Over $10,000,000 A state funded contract with a 5% condition of award small business enterprise goal and a 3% condition of award veteran-owned business goal. Carl Vogt Project Engineer Carl.Vogt@wsdot.wa.gov 206-515-3723 WADOT - SR 519, Seattle Ferry Terminal Slip 3 VTS Replacement

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.