Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

December 18, 2023

No Information to Display

1100 Riverfront Pkwy

Paving, Renovation, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

1100 Riverfront Pkwy, Eugene, OR

Subscribe to View Full Documents

University of Oregon (UO) Campus Design & Construction ("Owner") requests sub-bid proposals for Bid Package #4 - All Other Work. Bid Items include Earthwork for Riverfront Pkwy Improvements, Masonry, Stone Masonry & Exterior Stone Cladding, Architectural Woodwork, Site Furnishings, Walls and Ceilings/Drywall, Architectural Sheet Metal, Roofing, Skylights, Doors, Frames and Hardware, Glass and Mirrors, Painting and Coatings, Overhead Coiling Doors, Flooring, Tile, Terrazzo, Fluid-Applied Flooring, Restroom Specialties, Loading Dock Equipment, Food Service Equipment, Laboratory Equipment, Window Coverings, Site Concrete, Landscaping, Fencing & Gates and Asphalt Paving. Bidders must be properly licensed with the Oregon Construction Contractors Board ("CCB") at the time of bid. Bidders are required to file a $30,000 Public Works Bond with the CCB in accordance with ORS 279C.836 EXCEPT exemptions allowed under paragraphs (7) or (8) will not be permitted. Due to the scheduled start of the work, the $30,000 Public Works Bond must be on file with the CCB at the time of bid. This is a prevailing wage project. Bidders must comply with requirements of the prevailing wage law in ORS Chapter 279C. A Contractor Controlled Insurance Program ("CCIP") for on-site operations is being provided for general liability and workers compensation. Owner and Contractor are committed to promoting and stimulating the growth of disadvantaged business enterprises, minority business enterprises, women business enterprises, emerging small businesses and service-disabled veteran business enterprises (D/M/W/ESB/SDVBE) and maximizing opportunities for these firms to participate in the work of this project. Contractor has set a goal of 15% D/M/W/ESB/SDV participation on this project. Subcontractor shall endeavor to utilize such firms through sub-tier contracting and/or material purchases and shall provide documentation of their good faith efforts and achievements. This is a prevailing wage project.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.