Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

October 16, 2023

October 10, 2024

11 Farmers Rd

Site Work

No Information to Display

$1,190,611.00

Public - City

img_map_placeholder

11 Farmers Rd, Avon, NY

Subscribe to View Full Documents

Construction, installation, and setting-to-work of an external stand-alone gravity-flow ultraviolet (UV) disinfection system. Work under this Section shall consist of the testing of concrete wetwells, tanks, channels and any other concrete liquid holding structures located at the project site. These Specifications are intended to provide assurance of watertight structures. Contractor shall coordinate and pay all costs associated with testing requirements, including, but not limited to: pumping equipment, gauges, valves, plugs and supports. The Owner will make available the water necessary for testing from existing systems at cost to Contractor. The Contractor shall provide the means of filling the structure which is acceptable to Engineer/Owner. Sources of water other than potable water shall be submitted to Engineer/Owner for acceptance. Water payment shall be made to the municipality providing the water at their current water rate. Contractor shall provide Engineer/Owner written notice to commence testing procedures. Engineer/Owner and Contractor will conduct pre-test inspection of structures. Contractor shall promptly repair any surfaces showing signs of honeycombing, cracks, tie wire holes or stone pockets as required per section 03 30 00 General - upgrade to the wastewater treatment plant including but not limited to, the following: Construction of a new UV Disinfection tank and pole barn cover. Work includes general site construction, concrete/masonry tankage and building construction, equipment installation and process/site piping, bypass piping, bypass pumping and valves, grading and restoration. Work includes minor HVAC components of fan and louver. - Electrical - site work, trenching, upgrades and modifications to panels, wiring, conduit, fixtures, devices, connections to UV Equipment, motors, controls, lighting, terminations, new control wiring and panels. Wiring to fan and louver. Generator and automatic transfer switch work work and primary service installation for UV building, along with facilitation and furnishment of 3rd party inspection to satisfy utility requirements for new service. - Note bid alternates on the project Mark Bailey mbailey@mrbgroup.com Matt McKenna (August 1st through August 15th) Matthew.McKenna@mrbgroup.com

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.