Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 4, 2023

September 4, 2023

No Information to Display

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Saginaw, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Bids must be submitted in a sealed envelope, one bid per envelope, with the group number clearly indicated on the outside of the envelope. Contractors may be awarded a maximum of 4 projects per group. Photos are required before, during, and after construction, including ice and water shield and roof sheathing. All bids must be either typewritten or in ink. Property Location: 630 Munson Ct Inspector: Scott Nizinski Client: Alicia Doxie Inspector Telephone: (989) 759-1544 Telephone: (989) 501-5319 Loan Officer: Anjaile Goodwine Date: 6/7/2023 Loan Officer Telephone: (989) 577-0184 Soffit and Fascia replacement: AdditionalNotes: Project specification All work must comply with applicable codes and acceptable standards of workmanship. Individualjob specifications, hearer notes, orspecific materials or methodology instructions shall take precedence. The city reserves the right to alter specifications tofitparticular situations. Roof Shingles, Fascia>> Soffit and Gutter replacement package: Remove the old roof shingles down to the existing sheathing. Also remove any other necessary building components to properly complete the project. Properly dispose of all the debris away from the site. Install all new 30 year warranty architectural dimensional type roof shingles. Include all new 7/16" OSB roof sheathing. Install proper underlayment with Ice & water shield in all required areas. Include ail new drip edge, roof venting and any required flashing components. If proper soffit venting is not easily obtainable you may install an edge / intake roof vent (Smart Vent} system. Any low slope roof areas shall be a TPO type system or equivalent Include any required sheathing, flashings, corners, pipe boots & termination bars. If the existing chimney is in need of repair include a chimney repair cost noted on your invoice I bid sheet. Install all new aluminum soffit panels with a 1 to 1 ratio of solid and vented panels. Install all new aluminum fascia and rake boards. Include a new seamless aluminum gutter system with all new downspouts and proper extensions. The property owner shall be allowed to pick from all stock available colors. All work must be installed per the manufacturer's specifications and directions. The contractor must obtain a permit and have the work properly inspected and approved prior to payment. Upon completion the contractor shall also provide any required project photos and all warranty information prior to receiving payment. See the items circled and noted below for further project information.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.