Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 14, 2023

November 13, 2023

November 15, 2025

5845 Hellyer Ave

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

5845 Hellyer Ave, San Jose, CA

Subscribe to View Full Documents

The county of Santa Clara valley health plan HQ. Tenant improvements will house the countys valley health plan headquarters. The work will retrofit the second and partial ground floor of an existing 46,700sf, concrete tilt-up panel, single story, high bay building for use as the headquarters for valley health plan. This requires upgrades to the building, that includes new systems and equipment. The existing structure is two stories, the roof framing is wood panelized system comprised of sub-purlins and beams supported on steel columns, the second floor is a concrete over metal deck with steel open web joists/girders and steel beams supported on steel tube columns or concrete walls. The building is a cold shell constructed in 2,000 with three existing open stairs, an elevator, a loading dock, an electrical room, and a MPOE room. The updated building second floor will house VHP staff offices, workstations, two classroooms, conference rooms, breakrooms, and other amenities, the ground floor include a main entrance lobby, an office, work stations, conference rooms, break area, restrooms, shower facilities, secondary entries, new operable exterior walls connecting conference rooms to the exterior patio area, interior moveable partitions, storage/shipping and receiving area, support spaces, and an added second elevator. The balance of the building to be reserved as warm shell for future tenancy. The project is designed to be net zero energy facility and LEED ceritfied with natural ventilation with improved access to daylight on the second floor.

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.