Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

September 8, 2023

October 27, 2023

Multiple Locations

Paving, Site Work

No Information to Display

$600,000.00

Public - City

img_map_placeholder

Multiple Locations, Cheney, WA

Subscribe to View Full Documents

The project includes street preservation work on 2nd Street, involving existing asphalt surface preparation (crack sealing, pavement repair areas, asphalt patching), chip seal, and ADA curb ramp upgrades. Additionally, pavement reconstruction will be done on Mike McKeehan Way, which includes existing asphalt removal, preparation of existing gravel base with cement treatment (CTB), HMA paving, and pavement markings. The time for completion of the work on-site is 35 working days. All bids must be accompanied by a bid deposit in the form of a surety bond, postal money order, cash, cashier's check, or certified check in an amount equal to five percent (5%) of the bid proposed. The City of Cheney reserves the right to waive any irregularities or informalities and to reject any or all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. BID IS NOT ELIGIBLE FOR CONTRACTORS BOND ELECTION to withhold 50% retainage in lieu of furnishing a Contractors Bond (Performance and Payment Bond). TIME TO COMPLETE: The contract shall be completed in Thirty Five (35) working days from the date of commencement stipulated in a Notice to Proceed. furnish the contractors bond (performance and payment bond) in an amount equal to 100 percent

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.