Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

September 14, 2023

July 10, 2024

6499 Georgia St

New Construction, Paving, Site Work

No Information to Display

$705,500.00

Public - City

img_map_placeholder

6499 Georgia St, Groves, TX

Subscribe to View Full Documents

A. New Precast Chlorination/Chemical Building: Provide a new complete 24 x 30 x 12 precast concrete building, including reinforced concrete slab, foundation, remove eighteen inches and replace with compacted select fill, building, crane, doors, windows, HVAC equipment, pavement modifications, sidewalks, plumbing, piping, fixtures, electrical, connection to existing, and appurtenances. B. Reinforced Concrete Road: Furnish and install a 7 reinforced concrete road with 8 limestone subgrade, including demolition and removal of existing asphalt road, subgrade preparation, reinforced concrete, rebar, saw cutting, joints, connections to asphalt pavement and connections to limestone roadway. C. Raise Elevation of New Chlorination/Chemical Building: Furnish all labor, materials, tools, equipment, supervision, necessary to raise the proposed chlorination/chemical building by 1 of fill, including fill material, surface clearance, fill compaction and levelling. D. ALTERNATE BID - New CMU Chlorination/Chemical Building: Provide a new complete CMU building, including reinforced concrete slab, foundation, remove eighteen inches and replace with compacted select fill, building, crane, doors, windows, HVAC equipment, pavement modifications, sidewalks, plumbing, piping, fixtures, electrical, connection to existing, and appurtenances. The successful bidder must furnish Performance Bond and Payment Bond on the forms provided in the amount of one hundred percent (100%) of the total contract price from a Surety or other Sureties acceptable to the Owner Contract Times: Days The Work will be substantially completed within 270 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 300 calendar days after the date when the Contract Times commence to run.

43 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.