Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 25, 2023

October 26, 2023

July 22, 2024

To Be Determined

Renovation

No Information to Display

$3,200,000.00

Public - Federal

img_map_placeholder

To Be Determined, Patuxent River, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The purpose of this project is to modernize, repair, remove, or replace the fire protection systems currently installed in Bldgs. B2905, B1461, B2925, B2649, and B3261 per SOW specifications. All terms and conditions of N40080-22-D-1113/1114/1115/1116/1117/1118 and N40080-23-D1120 Indefinite Delivery Quantity Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. All contract clauses in the Basic Contract by reference or full text remain in effect unless superseded by this task order.You are responsible to adhere to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issues, please contact the POC as listed above. NAVFAC Solicitation Number: N4008022D2222 X005 NAVFAC Project No.: 1759508 Title: B2905, B1461, B2925, B2649, & B3261 Fire Panel Replacement Bundle Location of the Work: NAS PAX River, MD Description of the Work: The purpose of this project is to modernize, repair, remove, or replace the fire protection systems currently installed in Bldgs. B2905, B1461, B2925, B2649, and B3261 per SOW specifications. Design Build Budget Amount: The estimated Design Build Budget is $3.2 Million.. NAICS CODE: 236220 - Commercial and Institutional Building Construction Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government requires completion of construction within 270 calendar days after award (includes 15 calendar days for submission and approval of bonds and insurance). Wage Determination: Department of Labor (DoL) General Decision Number: MD20230008 06/02/2023 applies to this work. See Attachment B. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated at the time of award. The wage determination version in effect at the time of award shall apply to the work performed under this contract. Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages Construction, Liquidated Damages will be assessed in the amount of $749 for each calendar day of delay until the work is completed or accepted. Utilities: The Contractor shall be responsible for obtaining, either from available Government sources or local utility companies, all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used. Record Shop Drawings: In accordance with FAR 52.236.21 Specifications and Drawings for Construction, record shop drawings are required. Reproducible copies of these record drawings are also required. Bond Requirements: In accordance with FAR 28.101-4 and FAR 52.228-15 Performance and Payment Bond Construction, Performance and Payment Bonds, Bonds (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less. are required from the awardee and shall be submitted for approval to the Contracting Officer within 15 days after award of the Task Order. Commencement of construction is contingent upon approval of required bonds. An electronic copy of your bid bond must be submitted with your proposal. A hard copy of your bid bond will be requested from the apparent awardee upon confirmation of their price and must be submitted to the PCO office within one (1) buisness day from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed non-responsive and your proposal removed from consideration. Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers. Pre Proposal Inquiry (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries must be made in writing and shall be submitted via email to the POC no later than 7 August 2023 at 1500 local time with inquiries attached as an Excel document (no tables please), see Attachment C. Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects