Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

December 30, 2023

March 31, 2025

340 Cedar St

Renovation

No Information to Display

$2,929,500.00

Public - State/Provincial

img_map_placeholder

340 Cedar St, Saint Paul, MN

Subscribe to View Full Documents

Site Directions: 340 Cedar Street, St. Paul, MN 55101. State Project Number 02AS0033 Replace Obsolete DDC Controls at Andersen Building This solicitation is TG/ED/VO preference. A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) Verify all locations and quantities of the existing underfloor fan powered boxes to be replaced. 2.) Order all fan powered boxes (FPB), variable air volume box (VAV), transfer fan, etc. Work with the vendor and Owner for delivery specifics. 3.) Order any electrical devices required for install. 4.) Controls Contractor to order all components, devices, etc. required for installation. 5.) Replace existing VAV and install new transfer fan in Room C1243. 6.) Replace existing FPBs, including modifications to the heating water piping where applicable valves and controls per installation schedule to be determined at the start of the project. 7.) Replace existing RPBs, including modifications to the heating water piping where applicable, valves, and controls per installation schedule to be determined at the start of the project. 8.) Perform modifications to the controls/control sequences as described. 9.) Project closeout.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.