Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 4, 2023

October 4, 2023

121 Railroad Ave

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

121 Railroad Ave, South Hamilton, MA

Subscribe to View Full Documents

A. The Work of the Contract consists of 1. Vacant Unit Rehab 30F 667-01: Remove and replace kitchen cabinets, sanding and refinishing floors, patch and paint walls and trim, remove and replace kitchen and bathroom plumbing fixtures, remove and replace kitchen and bathroom flooring, remove and replace kitchen and bathroom lighting, and bathroom fan. 2. Work either shown on the Drawings or included in the specifications unless specifically indicated not to be done. 3. COVID-19 Plan: i. The Contractor shall take special measures to comply with all physical and social distancing and cleaning procedures outlined by Local, State and Federal Governments to limit the spread of COVID-19. COVID-19 prevention plan will be a point of discussion during all Construction Meetings. ii. Comply with the Owners specific requirements including but not limited to the following a. Masks shall be worn by all contractor and vendor employees. Temperatures shall be taken before any contractor employee is allowed access to the building. b. Sick employees of the contractor shall not be allowed to work on the project. c. Employees of the contractor shall not in any way interact with Staff and/or Residents at the work site. d. The work areas shall be fully and properly ventilated including opening of windows and provision of fans to ventilate the space. e. Providing a barrier between work areas and non-work areas where feasible. Unit 30F renovation Vacant Unit Rehab 30F 667-01: Remove and replace kitchen cabinets, sanding and refinishing floors, patch and paint walls and trim, remove and replace kitchen and bathroom plumbing fixtures, remove and replace kitchen and bathroom flooring, remove and replace kitchen and bathroom lighting, and bathroom fan. All rights reserved. Any rights not expressly granted herein are reserved.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects