Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 4, 2024

November 10, 2025

Werth Rd

Paving, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Werth Rd, Alpena, MI

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The Norway Ridge Pathway is a 7-mile system of year-round recreational trails for non-motorized use. There are a number of existing boardwalks and culverts that are identified for replacement in the attached EGLE permit. Please note that the culverts and one of the boardwalks, Site 19, have already been replaced. There are 6 locations that are to have new boardwalks listed below with their approximate lengths. One additional location, site 16, is to have the existing +/-92-feet of boardwalk removed with the trail segment to be blocked off and rehabbed/naturalized. Refer to the information included in the attached EGLE permit. 1. Site 3, +/-481-feet of existing boardwalk is to be removed and replaced. 2. Site 5, +/-52-feet of existing boardwalk is to be removed and replaced. 3. Site 9, remove existing culvert and replace with +/-40-feet of new boardwalk. 4. Site 13, +/-231-feet of existing boardwalk is to be removed and replaced. 5. Site 14, +/-34-feet of existing boardwalk is to be removed and replaced. 6. Site 15, +/-64-feet of existing boardwalk is to be removed and replaced. Project Address Werth Road, Alpena, Mi 49707 Please do not submit online questions via VSS. ALL questions should be emailed to Chris Schanbeck at schanbeckc@michigan.gov address no later than 2:00 p.m., Eastern on Friday, August 4, 2023. The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.