Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

September 8, 2023

May 31, 2024

Multiple Locations

Site Work

No Information to Display

$968,040.00

Public - City

img_map_placeholder

Multiple Locations, Gladstone, MO

Subscribe to View Full Documents

Project was awarded to Infrastructure-Solutions , including Bid Alternate A Project consists of the installation of 4,300 LF of 8 inch water main, 100 LF of 24 inch Storm Pipe and related appurtenances. The Owner reserves the right to accept or reject any or all Bids and to waive any technicalities, irregularities or informalities therein, to determine which is the lowest and best bid to accept and to approve the Bond. All wages paid for work under this Contract shall comply with requirements of the Prevailing Wage Law of the State of Missouri, Missouri Public Law 294, Sec. 290.210 through Sec. 290.340, R.S. Mo. 1969, as amended, and prevailing wages as established by the U. S. Department of Labor. The bidder is expected to base his bid on materials and equipment complying fully with the plans and specifications. In the event the bid is based on materials or equipment which do not conform, the bidder will be held responsible for furnishing materials and equipment which conform fully at no change in the bid price. Bid Bond or certified check on a reputable bank in the amount equal to five (5%) percent of the total amount of the Bid must accompany each Proposal. The bid deposit of the three lowest and best bidders will be returned within 48 hours after the executed contract and required bonds have been finally approved by the Owner. These Specifications and the Project Plans are intended to supplement, but not necessarily duplicate each other, and together constitute one complete set of Specifications and Plans so that any work exhibited in the one and not in the other, shall be executed just as if it has been set forth in both, in order that the work shall be completed according to the complete design. All other work shall be completed by May 31, 2024.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.