Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

December 9, 2023

3280 Eucalyptus Ave

Site Work

No Information to Display

$743,000.00

Public - City

img_map_placeholder

3280 Eucalyptus Ave, Chino Hills, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Work comprises, but is not limited to: construction of two (2) synthetic turf sports fields (Fields 5 & 6) and miscellaneous off site improvements. Project scope includes mobilization, demolition, construction surveying and staking, earthwork, grading, subbase and subdrain preparation for infields, connection to existing drain lines, and installation of synthetic turf fields as indicated on the construction plans and specifications. Contractor must coordinate with FieldTurf USA, Inc. (FieldTurf) for the removal of existing synthetic turf, installation of the new synthetic turf and must allow FieldTurf a minimum of six weeks to complete turf installation. The six-week installation period must be included within the total contract working days. Project Contractor must work in conjunction with Field Turf installers, and as required, provide a project timeline schedule incorporating final review and approval of aggregate base compaction, infiltration rates, survey and verification of perimeter nailer board prior to the beginning of the six-week allowance for turf installation. Pre-bid Meeting:None The Contractor shall possess a valid Class A Contractor's license at the time of submitting bids. The minimum acceptable experience shall include direct responsibility for the grading, drainage and base installation for at least six separate synthetic field turf projects (minimum of 65,000 square feet of contiguous base area per project) within the last three years, and four separate ballfield projects (minimum 2 fields). Separate projects awarded under one contract may qualify as individual projects. Failure to meet the minimum qualification will render a bidder non-responsive. 10% Bid Bond, 100% Performance Bond, 100% Payment Bond. It shall be mandatory, upon the contractor to whom the contract is awarded, and upon any subcontractor under him, to pay not less than the prevailing rate of wages as established by the City Council as they apply to the work being performed. Said prevailing rates are available from the State of California Department of Industrial Relations website. Engineer's Estimate - $680,000 (for Fields 5 & 6). Working Days - 54. Prospective bidders must be listed in the City of Chino Hills Engineering Division's project Plans Holders List to ensure receipt of issued addendum, if any, prior to submitting bid). No refund will be made of any charges for sets of Contract Documents. For Directions to Chino Hills City Hall refer to link under Description.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects