Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 25, 2023

September 1, 2023

No Information to Display

459 600 W

Renovation

No Information to Display

$17,340.00

Public - City

img_map_placeholder

459 600 W, Salt Lake City, UT

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Work items include: Contractor is responsible to compare Scope of work to the house and drawings and submit questions before bid opening. Obtain building permit and engineering stamp for seismic retrofit. Remove lower portion of the roof covering and decking from the roof to gain access to top of brick walls for the seismic roof to wall connection. Install pins, bolts, framing anchors, blocking and straps as per engineering plans and details for the building permit. Bracing of chimney(s), if applicable, per engineering plans and details for the building permit (1) After final inspection is completed, install roof decking where removed. Install new roof covering to match existing, as close as possible, along the perimeter of the home where removed for seismic retrofit. Clean up and removal of all construction debris. The Unreinforced Masonry/Wood gable walls will require additional seismic improvements not listed in the Scope of Work. (5) The seismic improvement may include gable bracing attached to the Masonry/Wood gable If shear walls are need to connect walls to roof, that is part of the roof to wall connection process. At permitting, a stamped engineered drawing shall detail the seismic improvement procedure.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects