Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

September 7, 2023

March 29, 2024

7495 S 1300 W

Renovation

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

7495 S 1300 W, West Jordan, UT

Subscribe to View Full Documents

1. In the Headworks Building demolish and remove the existing VFDs including the existing control sections. Install the new OWNER furnished VFDs in the locations shown on the Drawings. Install the new control sections for the VFDs as shown on the Drawings. The control sections are furnished by a Systems Integrator under contract to the OWNER. Modify existing raceway, cables supports as necessary. Startup, test, and commission the new VFDs. 2. In RAS/WAS Building 1 demolish and remove the existing VFDs. Demolish and modify the motor control centers. Install the new OWNER furnished VFDs in the locations shown on the Drawings. Modify existing raceway, cables supports as necessary. Startup, test, and commission the new VFDs. 3. In RAS/WAS Building 2 demolish and remove the existing VFDs. Install the new OWNER furnished VFDs in the locations shown on the Drawings. Modify existing raceway, cables supports as necessary. Startup, test, and commission the new VFDs. Demolish the existing PCM-1500 and install a new PCM-1500 furnished by the System Integrator. 4. In the Solids Handling Building demolish and remove the existing odor control fan VFDs. Install the new OWNER furnished VFDs. Modify existing raceway, cables supports as necessary. Startup, test, and commission the new VFDs. 5. Demolish existing fiber optic cable and install new fiber optic cable as shown on the Drawings. The OWNER reserves the right to reject any or all bids, to waive any informality in a bid.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects