Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 4, 2023

October 2, 2023

5th St NE

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

5th St NE, Auburn, WA

Subscribe to View Full Documents

The major items of work include installing 250 feet of sidewalk to fill an existing gap along 5th Street NE from A St NE to B St NE on the south side of the roadway along with 2 new curb ramps and 2 replacement ramps. The proposed bid range for the project is from $92,000 to $150,000. The entire project, including cleanup, shall be physically completed within 20 working days. This project is funded with the Community Development Block Grant and City of Auburn monies All bid proposals shall be accompanied by a bid deposit in cash, certified check, cashier's check or proposal bond (surety bond) in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such Contract and furnish satisfactory Contract Bond within the time stated in the Bid Documents, the bid deposit shall be forfeited to the City of Auburn The City reserves the right to reject any and all bids, waive technicalities or irregularities and to accept any bid if such action is believed to be for the best interest of the City of Auburn *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work provides for the construction of Project MS2214, 2023 CDBG Sidewalk Improvements. The major items of work include installing 250 feet of sidewalk to fill an existing gap along 5th Street NE from A St NE to B St NE on the south side of the roadway along with 2 new curb ramps and 2 replacement ramps.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects