Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

October 9, 2023

October 28, 2025

Multiple Locations

Demolition, New Construction, Paving, Site Work

No Information to Display

$6,929,450.00

Public - County

img_map_placeholder

Multiple Locations, Copperopolis, CA

Subscribe to View Full Documents

The Project is located at the Calaveras County Water District's Copper Cove Water Treatment Plant (WTP) at Kiva Place, Copperopolis, California 95228 and the Copper Cove B Tanks Site at Signal Hill, Copperopolis, California 95228 located in the community of Copperopolis. The Project consists of the following work: 1. Demolition of existing redwood tank. 2. Construction of new welded steel storage tanks at the Water Treatment Plant (WTP) and B Tank Site. 3. Rehabilitation of the existing WTP clearwell and Steel B Tank. 4. Associated site piping, both above ground and below ground, and appurtenances for interconnection. 5. Pavement, site grading, and installation of concrete tank foundation. 6. Installation of chain link fence and chain link double swing gate. 7. Miscellaneous electrical improvements and cathodic protection for tanks. 8. Coordination with District for demolition, relocation, and interconnections to existing facilities in such a manner as to minimize impacts to Copper Cove Water Treatment Plant's ability to provide water to its customers. The Phase 1 improvements shall be substantially complete 420 calendar days and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 750 calendar days after the date when the Contract Times commence to run. The Phase 2 improvements shall be substantially complete within 720 calendar days and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 750 calendar days after the date when the Contract Times commence to run. A Bid must be accompanied by Bid security made payable to Owner in an amount not less than 5 percent of Bidder's maximum Bid price and in the form of a certified check or bank money order or a Bid Bond issued by a surety meeting the requirements of Paragraphs 6.01 of the General Conditions. Seven (7) days Prior to the Bid Date for questions and clarification. Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner's requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it shall be accompanied by such bonds. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be non-responsible. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.