Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 11, 2025

October 16, 2023

March 14, 2024

Multiple Locations

Site Work

No Information to Display

$666,616.00

Public - City

img_map_placeholder

Multiple Locations, Yuma, AZ

Subscribe to View Full Documents

Abandon the 2" AC water line from 24th Street to 25th Street between 5th and 6th Avenue and install 2-6" water lines from 24th Street to 25th Street, with one on 5th Avenue and the other on 6th Avenue. Existing water meters are in the back of the properties, new water meters need to be installed on the front of the properties. As well a new 12" PVC water line will be installed along 25th Street between 8th Avenue to approximately 145 feet east of 5th Avenue. Existing asbestos water line will be abandoned in place. These lines will have connected 2 fire hydrants and 14 water services. question Deadline 08/08/2023 at 11:00 AM MT Questions must be received through the Procurement Portal and so that a response may be posted as an addendum to the RFB through the Procurement Portal. The Work shall be substantially complete within 120 calendar days after the date when the Contract Times commence to run as provided in the Notice to Proceed, and all Work shall be finally completed and ready for final payment in accordance with the Notice to Proceed within 150 calendar days after the date when the Contract Times commences to run

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.