Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

October 23, 2023

April 29, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$6,470,000.00

Public - City

img_map_placeholder

Multiple Locations, San Diego, CA

Subscribe to View Full Documents

License Requirements A Pre-Bid Meeting No Online Q&A No Work will involve furnishing all labor, materials, equipment, services, quality assurance and construction including but not limited to grinding, cold milling, hauling and disposal of the existing asphalt and concrete and installment of new pavement, excavation for pavement base repair for approximately 5.32 miles of streets, installation of Asphalt Concrete with Aramid Fiber, raising appurtenances and survey monuments to grade, night work, sweeping, installation of curb ramps to meet ADA requirements, sidewalk panel removal and replacement, curb and gutter removal and replacement, cross gutter and alley apron removal and replacement, commercial driveway replacement, relocation of pedestrian push buttons, installation of new pedestrian push buttons and push button posts, removal and replacement of pedestrian barricades, tree trimming, root pruning, tree removal, weed abatement, weed spraying, replacing traffic striping/markings, markers/devices, replacing vehicle detector loops and stubs, traffic control drawings and permits, storm drain inlet protection, and installation of inlet markers for various streets throughout the City. SLBE participation 7.9% ELBE participation 7.2% Total mandatory participation 15.1%

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.