Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 11, 2023

September 10, 2024

Multiple Locations

Site Work

No Information to Display

$45,000.00

Public - City

img_map_placeholder

Multiple Locations, Burlington, MA

Subscribe to View Full Documents

The scope of work involves removing and replacing the current fuel island and two double- walled FRP underground storage tanks (USTS). Both the fuel island and USTS will be replaced with new equipment of the same kind. The UST's consist of one (1) 10,000-gallon gasoline UST and one (1) 6,000-gallon diesel UST. The project will be divided into two phases. The first phase will entail demolishing and installing the fuel island, along with its associated equipment, as well as ordering the USTs. The second phase will involve removing the old UST's and installing the new ones The required contract completion period is 365 consecutive days. Phase I will be 105 days and Phase 2 will be 260 days Bid Security in the form of a bid bond, cash, certified check, treasurer's or cashier's check payable to the Owner, is required in the amount of five percent of the bid The selected contractor shall furnish a performance bond and a payment bond in amount at least equal to one hundred percent (100%) of the contract price as stipulated in Section 00700 GENERAL CONDITIONS of these specifications. All bids for this project are subject to applicable bidding laws of Massachusetts, including General Laws Chapter 30, Section 39M as amended. By submission of a bid, the Bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded after the opening of bids. The Owner reserves the right to waive any informalities in bids and to reject any or all bids.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects