Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

November 1, 2023

October 31, 2026

To Be Determined

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

To Be Determined, Sacramento, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Contractor agrees to provide to the Department of California Highway Patrol (CHP) all personnel, labor, materials, tools, supplies, equipment, permits and licenses necessary for airplane maintenance and repair for aircraft assigned to the CHP Valley Division Air Operations Unit (VDAOU) and the Golden Gate Division Air Operations Unit (GGDAOU). In the event of an emergency or temporary reassignment CHP reserves the right to request contractor to provide maintenance to other aircraft owned and operated by CHP. Question Deadline 08/02/2023 at 10:00 AM PT. Bidders shall submit questions via email to Tessa Gomez at tegomez@chp.ca.gov. To ensure a response and inclusion in the Questions & Answers (Q&A) document, questions must be received by the scheduled date in Section B, Time Schedule. The term of the resulting agreement is anticipated to be effective from November 1, 2023 through October 31, 2026 with two (2) one (1) year options to extend by the state. CHP will not hold a walk-through for this IFB. The total small business subcontractor participation must equal no less than twenty-five percent (25%) of the total bid price or cost offered. CHP reserves the right to reject all bids and to cancel this IFB if it is in the best interest of CHP to do so. preference up to five percent (5%) of the lowest responsive bid In granting small/micro business preference, no bid price will be reduced by more than five percent (5%). The cost adjustment is for computation purposes only and does not alter the actual cost offered by the bidder

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.