Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 4, 2023

September 18, 2023

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, San Rafael, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Contractor shall perform everything required to be performed and shall provide and furnish all the labor, materials, necessary tools, equipment, and services required to complete all the work, in accordance with requirements contained in the contract documents therefor entitled, 2023 PAVEMENT DIGOUT PROJECT, PHASE 2 Said work to be performed in strict compliance with said plans, specifications and contract documents, which are hereinafter enumerated. It is agreed that said labor, materials, tools, equipment and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives. Questions concerning the Bid should be submitted via Bid Express no later than 5 p.m. on Thursday, July 27, 2023 This project generally consists of grinding and paving asphalt concrete digouts, traffic control, storm water pollution control and related incidental work on Lucas Valley Road. The Engineer's estimate for this project is $160,000 Bids are required for the entire work described herein. There is no pre-bid meeting scheduled for this project. Question Deadline 07/27/2023 at 5:00 PM PT A Bid Bond, cash, certified check, or cashier's check, in the amount of 10% of the total bid amount payable to the County of Marin shall accompany the Proposal. These wages are set forth in the General Prevailing Wage Rates for this project, available at the Department of Public Works. Prevailing Wage rates are also available at the State of California Division of Labor Statistics.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects