Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

September 8, 2023

No Information to Display

1651 W Elk Ave

Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

1651 W Elk Ave, Elizabethton, TN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The contractor shall be responsible for all labor, material and equipment necessary to complete the scope of work at Sycamore Shoals State Park. Contractor shall be responsible to take their own measurements, etc., to quote the scope of work. Contractor is responsible to remove all debris from construction site off state property to an approved location. Licensing requirements are BC, BC-B or BC-B(sm), depending on the cost of construction. The State may cancel this ITB in its entirety and reissue it in whole or in part. The State may reject any or all responses in its sole discretion. Additionally, the State may reject a response that: (a) qualifies the offer to provide goods or services as required by this ITB; (b) proposes alternative goods or services unless expressly requested by this ITB; (c) involves collusion, consultation, communication, or agreement among respondents; (d) includes information the respondent knew or should have known was materially incorrect; or (e) does not comply with the terms, conditions, specifications, or performance requirements of this ITB. SCOPE: FORT WALL-C REPLACEMENT ON FORT WATAUGA AND INTERIOR EXCAVATION Fort Watauga is a Reproduction Fort at Sycamore Shoals State Park. Fort Wall-C needs replaced because of post deterioration. Wall-C must be removed for equipment to gain entry for needed excavation inside Fort. Licensing requirements are BC, BC-B or BC-B(sm), depending on the cost of construction. 1. WALL-C Contractor shall: A. Remove all existing Fort wall post on Wall-C. B. Remove existing concrete that is poured around Fort Wall-C post. C. After post and concrete have been removed a 2-feet wide X 38-inches deep ditch must be left for a concrete footer for post to set on. D. Pour 8-inches of 4,000 PSI concrete for the Fort Wall-C post to set on. Install two 1/2-inch rebar continuous in concrete footer. Rebar must set on rebar chairs, spaced every 4-feet and rebar must lap a minimum of 3-feet. Rebar must be tied together with tie wire. Install rebar grade stakes at each rebar chair. Tie rebar to chairs and chairs to grade stakes. E. Fort Wall-C post shall be round pressure treated. Post shall be the same size and variances as existing. All Fort Wall-C post shall be sharpened on top to match existing and appear to have been sharpened with an axe with the same height as existing post. F. All post shall sit on the footers and have dirt tamped on both sides of post to hold them in a plumb position. Soil that is tamped on inside and outside of post shall be even with existing soil. G. Any disturbed soil connected with removal of existing post and installation of new post must be graded smoothth, seeded and strawed. Grass seed type to be determined by Park Manager

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.