Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

$125,000.00

Public - County

img_map_placeholder

Multiple Locations, Edwardsville, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Notice is hereby given that the Buildings & Facilities Management Committee of the Madison County Board for Madison County will seek Scaled Proposals for Madison County Standby Generator Installations and Upgrade Project for the Administration Building, Courthouse, Jail, and EMA Garage. The right is reserved to reject any and all bids 3-4", 1 - 1-1/4", and 2 - 1 " conduits have been laid from the east comer ofsmall parking lot, across 2nd street, and 90 into the Quazite junction box in the sidewalk near the transformer by the Administration Building. The PVC conduit is capped offunder the concrete. 3. The contractor shall extend the excavations and PVC conduits from the capped offPVC conduits in the parking lot to the new generator pad. 4. The contractor shall excavate around the Quazite box, transformer, and building as needed to place new conduits as needed for the new power and transfer switch. 5. The contractor shall provide and install a new 1200-amp service entrance rated automatic transfer switch and all necessary wiring from the incoming service to the to the transfer switch, into the main building, and out to the new generator. This includes the main power wiring, block heater wiring, battery charger wiring, engine start circuit, and remote annunciator wiring. Do not run Any direct current (DC) wiring or Data Link wiring in the same conduit that contains alternating current (AC) wiring. Use only stranded wire for metering, battery charger, and control connections to any part ofthe engine/generator. Use proper size shielded cabling for signal wires. Use proper terminal crimp connections on wire ends.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.