Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 14, 2023

September 18, 2023

November 3, 2023

401 Lake Ave

Renovation

No Information to Display

$106,450.00

Public - City

img_map_placeholder

401 Lake Ave, Fairmont, MN

Subscribe to View Full Documents

A. Project Name: Sylvania Bandshell Roof Replacement B. Owners Name: City of Fairmont C. Architect's Name: Wold Architects and Engineers. D. Additional Project contact information is specified in Section 00 01 03 - Project Directory. E. The Project consists of the construction of re-roofing. 1. Briefly and without force and effect upon the Contract Documents, the Work of this single prime Contract can be summarized as follows 2. Work under this Contract includes: a. Sitework: 1) Site restoration of areas disturbed by construction, staging, equipment, etc. b. Building Enclosure: 1) Roofing systems of fully adhered single ply and pre-finished metal coping. F. Keep Architect fully informed about progress of the work, performance of the work and potential problems. This project includes: Replacement of existing roof system. Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to City of Fairmont in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Owner requires Substantial Completion of the project on or before November 3, 2023.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.