Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

December 1, 2023

July 31, 2024

2633 Causeway Blvd

Site Work

No Information to Display

$560,000.00

Public - Federal

img_map_placeholder

2633 Causeway Blvd, Tampa, FL

Subscribe to View Full Documents

The repair of the four (4) Shrimp Docks and bulkheads located at 2633 Causeway Boulevard, Tampa, FL. The Shrimp Dock facility was constructed circa 1980 and has severe corrosion-related deterioration consistent with a 40+ year old structure exposed to the harsh marine environment. The project includes repair of the following: 1. Dock Repairs: Replacement of deteriorated 14-inch square prestressed concrete piles, installation of cathodic protection jackets at 14-inch square concrete piles, concrete spall repair at piles, pile caps and deck slabs, and replacement of concrete deck slabs at the Docks; 2. Building Foundation Repairs: Installation of cathodic protection jackets at 12-inch square concrete piles at the buildings. 3. Steel Bulkhead Repairs: Concrete spall repair at the bulkhead cap, replacement of timber chocks and timber fender piles, blast cleaning, welded plate repairs, and recoating of steel sheet piles above Mean Low Water elevation, welded plate repairs below water, and installation of galvanic anodes at the steel sheet pile bulkhead. 4. Concrete Bulkhead Repairs: Concrete spall repair at the concrete sheet piles and bulkhead cap. Each Bid must be accompanied by a certified check, cashiers check, or Bid Bond prepared on PTBs form (provided in Bid package), which is duly executed by the Bidder as Principal, and meeting the standards specified herein, in the amount of not less than ten percent (10%) of the amount of the base Bid PTB has a goal of nine (9%) percent SBE participation for each contract it awards. Work to be performed shall be substantially completed within two hundred and forty-three (243) days from Day Number One in the Notice to Proceed. Friday, December 1, 2023 Start Date

51 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.