Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

October 9, 2023

February 6, 2024

40086 Paseo Padre Pkwy

Renovation

No Information to Display

$2,885,400.00

Public - City

img_map_placeholder

40086 Paseo Padre Pkwy, Fremont, CA

Subscribe to View Full Documents

The work includes demolish existing cap sheet roofs down to the substrate for City Hall Building A and B. Install new fall protection system around the atrium of the two roofs after installing the new roofing system. The new roof system consists of two ply modified bitumen with specified insulation to comply with title 24. Install walking pads where they are applicable for servicing mechanical equipment on the roof. Install two new roof hatches to comply with Cal OSHA standards. And all necessary work in the drawings and specifications provided. The estimated construction cost, or construction cost range, for the Project is $3,000,000. This estimate serves only as a guideline to bidders of the scope of the Work and the Project. No bidder, including the successful bidder, is entitled to make any claim against City based on inaccuracy of the estimated cost or range of cost of the Work or the Project. Each Subcontractor must be registered with the DIR to perform work on public projects. Each bidder must submit a completed Subcontractor List form with its Bid Proposal, including the name, location of the place of business, California contractor license number, DIR registration number, and portion of the Work (based on the Base Bid) for each Subcontractor that will perform work or service, or fabricate or install work, for the prime contractor in excess of one-half of 1 % of the bid price, using the Subcontractor List form included with the Contract Documents. A bidder who fails to attend a mandatory conference may be disqualified from bidding. Any changes will be advised by the issue of an addendum. Questions and Requests for Information or Clarification. Questions, requests for information, and requests for clarification regarding the Project, the bid procedures, or any of the Contract Documents must be submitted to City in writing, addressed to the Project Manager for the Project, as follows: City of Fremont Public Works Facilities Attn: Jimmy Y. Chen 39550 Liberty Street Fremont, CA 94537 Email: jichen@fremont.gov Phone: (510) 494-4715

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.