Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

October 16, 2023

June 30, 2025

Multiple Locations

Demolition, Renovation, Site Work

No Information to Display

$3,219,500.00

Public - City

img_map_placeholder

Multiple Locations, Runnells, IA

Subscribe to View Full Documents

Retrofitting and updating an existing wastewater treatment facility, including but not limited to: demolition of existing infrastructure, conversion of the existing oxidation ditch to an activated sludge treatment basin and replacement of existing clarifier equipment, conversion of the existing polishing pond into a covered aerated lagoon cell, construction of new UV disinfection structure, installation of new exterior blowers for the upgraded polishing pond and activated sludge treatment unit, new controls in the existing control building, and installation of various manholes, piping, valves, fittings and appurtenances. The start date for the work will be ten (10) days after the Notice to Proceed and the Work will be substantially completed on or before April 15, 2025. Should the Contractor fail to complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed to the work not completed within the designated contract term. The work shall be fully completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before June 30, 2025. Should the Contractor fail to complete the work in this timeframe, liquidated damages of Two Hundred and Fifty Dollars ($250.00) per calendar day will be assessed to the work not completed within the designated contract term. Parts of the Work shall be substantially completed on or before the Milestone #1: UV Disinfection System substantial completion date of November 30, 2024. Should the contractor fail to complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed to the work not completed within the designated contract term. The successful bidder will be required to furnish bonds in an amount equal to one-hundred percent (100 percent) of the contract price,said bondsto be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of Contractor The City of Runnells, Iowa, reserves the right to reject any and all bids and to waive informalities.

68 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects