Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 18, 2023

September 18, 2023

February 25, 2024

Multiple Locations

Renovation

No Information to Display

$560,000.00

Public - City

img_map_placeholder

Multiple Locations, Huntington, WV

Subscribe to View Full Documents

- New restroom facility at Rotary Park, Huntington, WV - Demolition of an existing facility - Site work, including erosion and sediment controls, excavating, grading, etc. - Installation of concrete patio and asphalt road - Utility service connections to the proposed building - New picnic shelter at Memorial Park, Huntington, WV - New sidewalk connections, water fountain, and grill amenities After the mandatory pre-bid meeting for those wishing to familiarize themselves with the site. All technical questions should be referred to James Yost in writing or via email at j.yost@gaiconsultants.com by 5:00 pm August 4th, 2023. Direct Phone calls are prohibited. The Work of this Project includes the following general elements: - The first project consists of a new restroom facility for the Greater Huntington Park and Recreation Districts located at Rotary Park in east Huntington, West Virginia. An existing facility will be demolished by the Owner. Site work includes placing of erosion and sediment controls, excavating, grading, removal and disposal of existing concrete pad and asphalt entry. Installation of concrete patio and asphalt road as well as utility service connections to the proposed building - The 2 nd project consists of a new picnic shelter for the Greater Huntington Park and Recreation District located at Memorial Park in west Huntington, West Virginia. The project site will include new sidewalk connections to the existing trail with water fountain and grill amenities serving the shelter and adjacent existing playground.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects