Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2023

September 11, 2023

October 11, 2023

5877 NY-353

Paving, Site Work

No Information to Display

$44,900.00

Public - State/Provincial

img_map_placeholder

5877 NY-353, Little Valley, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Final Date for Receipt of Questions: August 7th, 2023 The purpose of asking questions during the site visit is to obtain clarification to the enclosed Project Scope. In the event that modifications are needed to the Project Scope, the modifications will be distributed by the WNYDDSO Business Office to all contractors. Contractors are to prepare and submit their quotes based on the written Project Scope and any modifications made in writing. Insurance: The Contractor agrees that without expense to the State, insurance will be maintained during the period of the proposal and contract, insurance of the kinds and in the amounts indicated, with insurance companies authorized to do such business in the State of New York, covering all operations under this proposal and contract. Summary of Work: Complete driveway tear out and replacement At 5877 Route 353 Little Valley, NY 14755 -Driveway REPLACMENT-The vendorshall provide all labor and materials necessary to complete the work in a professional manneraccording to scope of work and architectural drawings and spec's. Work is to be completed within 30 days of award. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of roof replacement before removal of equipmentand scaffolding,contractor is to schedules quality control and quality assurance inspection with Plant Superintendent. GENERAL REQUIREMENTS: Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. Work is to be done between the hours determined by the approved safety plan, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each work day. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD. Prior to the commencement of the work, there shall be a meeting with DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects