Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

September 25, 2023

July 1, 2024

2900 Lemay Ferry Rd

New Construction, Paving, Site Work

No Information to Display

$4,257,000.00

Public - City

img_map_placeholder

2900 Lemay Ferry Rd, Saint Louis, MO

Subscribe to View Full Documents

For project related questions, please contact Dickinson Hussman Architects ( Laura LeFevre at llefevre@dharch.com ). The scope of the project is to furnish, install, commission and place into operation an H.V.A.C. system that meets the intent of the design and the goals of the owner and users as outlined in the bid documents. The Division 23 contractor shall provide all equipment, controls, labors, sub-contractors and accessories required to install a fully operational system. All coordination between trades is the sole responsibility of the contractor. The contractors proposal shall include all items that are required by code, industry accepted practices and the standards incorporated in the performance specification. The contractor shall request all clarifications to the design documents prior to submitting his bid. By submitting a bid the contractor acknowledges that the firm is qualified to install and place into operation the mechanical systems shown in the bid documents. Further, the firm understands the design intent, the system configuration and the overall nature of the project. Failure to understand the system and the requirements of the system installation shall not justify additional charges to the bid contract. *As of September 6, 2023, addendum 8 has been issued.

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.