Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

November 22, 2023

958 Wilmington Ave

Renovation

No Information to Display

$150,000.00

Public - City

img_map_placeholder

958 Wilmington Ave, Dayton, OH

Subscribe to View Full Documents

All bids must be accompanied by a bid guarantee equivalent to 5% of the bid price; and at least one of the following: A. A performance bond and payment bond for 100% of the contract price; B. A performance bond and a payment bond, each for 50% or more of the contract price; C. 20% cash escrow; D. A 10% irrevocable letter of credit with terms acceptable to GDPM; E. Any other payment method acceptable to GDPM Greater Dayton Premier Management reserves the right to reject any or all proposals, or waive any informality in the bidding Question Deadline 08/01/2023 Work Summary: i. Work of the Project includes the flooring replacement at the common areas of Wilmington Hi-Rise as outlined / located on the drawings and in the detailed specifications. Links to the drawings and detailed specifications are located below. 1. All specific scope items shall be coordinated and reviewed on the drawings and specifications as applicable. 2. Removal of damaged VCT flooring and rubber base. 3. Removal of gyp-crete floor topping complete to the top of the original subfloor. 4. Installation of new plywood overlayment [in multiple layers as applicable to match original floor system thickness]. 5. Installation of new LVP flooring and rubber base. 6. Installation of new accessible thresholds at unit entrance and common area doors. 7. Repair of existing gypsum board finishes at the corridors. 8. Prep and paint gypsum board walls, soffits, and ceilings at the areas of work 9. Prep and paint existing hollow metal doors and frames and casing at the areas of work. 10. Ancillary work required to accomplish the work scope as intended.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects