Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 12, 2025

October 23, 2023

April 4, 2025

Multiple Locations

Site Work

No Information to Display

$3,996,374.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Wylie, TX

Subscribe to View Full Documents

This project includes construction of replacement of select air valve vaults and improvements to select existing air valves, vaults and supporting appurtenances within the NTMWD North System along the following transmission pipelines: BASE BID (36 Locations) Five (5) Locations on High Service PS 3-1 and Pipeline (Pipeline A) - 90" AWWA C301 (RCCP) One (1) Location on 121 Site Facility Water Transmission Pipeline Phase 1 (Pipeline ABC) - 12" PVC Three (3) Locations on Plano-McKinney 84" Pipeline Project B Phase 1 (Pipeline AC) - 84"AWWA C301 (RCCP) Three (3) Locations on Plano-McKinney 96" Pipeline Phase 3 (Pipeline B) - 78" PCS and 96" PCS One (1) Location on Plano-McKinney Water Transmission System Projects Phase 1 (Pipeline E) - 84" AWWA C301 (RCCP) One (1) Location on North McKinney Pipeline Phase 1 & 2 (Pipeline L) - 60" PCS Two (2) Locations on A/P/F/M 72" Pipeline Project A Phase 1 (Pipeline N) - 72" PCS One (1) Location on A/P/F/M 72" Pipeline Project B Phase 1 (Pipeline Q) - 72" PCS One (1) Location on Wylie-McKinney 20" Pipeline (Pipeline R) - 20" AWWA C303 (Bar-Wrap) Ten (10) Locations on McKinney 14" Pipeline (Pipeline S) - 14" DIP Six (6) Locations on Farmersville 14" Pipeline (Pipeline T) - 14" DIP and 24" AWWA C303 (Bar-Wrap) One (1) Location on McKinney Parallel 42" Pipeline Phase 3 (Pipeline W) - 42" AWWA C301(RCCP) One (1) Location on Frisco-McKinney Pipeline Contract B (Pipeline X) - 48" AWWA C303 (Bar-Wrap) All questions regarding this bid shall be submitted in writing, through electronically no later than 12:00 pm (Noon) on Wednesday, August 2, 2023. Questions received after the deadline may not be answered.

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.