Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 25, 2023

August 10, 2023

September 14, 2023

Multiple Locations

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Springfield, OR

Subscribe to View Full Documents

Prevailing Wage Required We do not and shall not discriminate on the basis of race, color, religion (creed), gender, gender expression, age, national origin (ancestry), disability, marital status, sexual orientation, or military status, in any of our activities or operations. These activities include, but are not limited to, selection of volunteers and vendors, and provision of services. We are committed to providing an inclusive and welcoming environment for all volunteers, subcontractorsand vendors. Performance Dates: Completed by September 14, 2023 or sooner. Bid Bond: If the Utility estimates the Public Improvement contract resulting from this bid will exceed $100,000, each bid must be accompanied by a Bid Bond or a certified cashier's check upon a bank in good standing, payable to SUB, in an amount equal to at least ten (10%) percent of the total amount of the bid (OAR 137-049-0290). Such funds shall be forfeited and become the property of SUB if the bidder fails or refuses to enter into a contract and furnish satisfactory bond within ten (10) days (weekends and holidays excepted) after notification that its bid has been accepted. The check accompanying the accepted bid will be retained until the contract is signed and the contract bond of the successful bidder is approved by SUB. Bid bonds shall be issued by a surety company registered to issue bonds in the State of Oregon and utilizing a bond form acceptable to SUB. Such bid guaranty bond shall be forfeited and become the property of SUB in case the bidder shall fail or neglect to furnish a satisfactory Performance and/or Payment Bond issued by a viable bond company acceptable to SUB as required by ORS 279C.380 and to execute the contract within ten (10) days (Saturday, Sunday and Holidays excepted) after receiving contract from SUB for execution. For information regarding Performance and Payment Bond requirements, contact the individual specified in Section 4 above. Payment & Performance Bond: If the contract that results from this bid exceeds $100,000, the successful bidder shall furnish, as part of execution of the contract, a corporate Surety Payment and Performance Bond in an amount equal to the full amount of the contract (OAR 137-049-0460). This bond shall be conditioned upon the faithful performance of the contract and upon payment of all persons supplying labor and materials for the construction of the work. The form and surety for the bond shall meet the approval of SUB and its attorney. Bids shall be received in a sealed envelope marked with the job name and bid number and addressed to: Sandi Weston Springfield Utility Board Electric Division 1001 Main St Springfield, OR 97477 ORemailed to electricbids@subutil.com

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects