Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

September 14, 2023

November 13, 2023

To Be Determined

New Construction, Site Work

No Information to Display

$237,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Lexington, KY

Subscribe to View Full Documents

The MS 539 Egress Corridor project is to build new egress corridor that passes thru a large research lab in the Medical Science Building. Lab space will be divided into two separate labs with new egress corridor between them. Bids will be received from Prime Contractors on a Lump Sum Amount for the total project. All phases of the work shall be bid to and through the Prime Contractors. Bids shall be submitted in the manner herein described and on the official proposal form included with the conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. The project is to build new egress corridor that passes thru a large research lab in the Medical Science Building. Lab space will be divided into two separate labs with new egress corridor between them. PROJECT: MS 539 Egress Corridor The Scope of Work consists of the Invitation for Bid, CCK-2739-24, dated July 18, 2023; the Contractor's Form of Proposal dated August 15, 2023, including Addendums 1,2,3 etc, the General Conditions, the Special Conditions, the Contractor's Bonds and Insurance and Affidavit, the Specifications, the Drawings including Supplemental Drawings and Change Orders issued after execution of the Contract for the Work described in Article No. 1 of this Agreement, all of which are incorporated in and made a part thereof of reference, and which shall be binding upon the Contractor and Owne

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects